A.4.1.1.18 - Pemasangan 10 Kg kabel presstressed polos/strands

A.4.1.1.18 - Pemasangan 10 Kg kabel presstressed polos/strands
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
Pekerja OH 0,0500 81.500,00 4.075,00
Tukang Besi OH 0,0500 96.500,00 4.825,00
Kepala Tukang OH 0,0050 107.000,00 535,00
Mandor OH 0,0030 107.000,00 321,00
JUMLAH HARGA TENAGA 9.756,00
B BAHAN
Besi beton ( polos ) Kg 10,5000 10.100,00 106.050,00
Kawat beton Kg 0,1000 23.500,00 2.350,00
JUMLAH HARGA BAHAN 108.400,00
C ALAT
- - - - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 118.156,00
E Overhead & Profit 10% x D 11.815,60
F HARGA SATUAN   PEKERJAAN ( D + E ) 129.971,60