A.4.4.2.25 - Pemasangan 1 M2 finishing siar pasangan conblock ekspose
A.4.4.2.25 - Pemasangan 1 M2 finishing siar pasangan conblock ekspose |
NO |
URAIAN |
SATUAN |
KOEFISIEN |
HARGA SATUAN |
JUMLAH HARGA |
A |
TENAGA |
|
|
|
|
|
Pekerja |
OH |
0,0700 |
81.500,00 |
5.705,00 |
|
Tukang Batu |
OH |
0,0350 |
96.500,00 |
3.377,50 |
|
Kepala Tukang |
OH |
0,0040 |
107.000,00 |
428,00 |
|
Mandor |
OH |
0,0040 |
107.000,00 |
428,00 |
|
|
|
JUMLAH HARGA TENAGA |
9.938,50 |
B |
BAHAN |
|
|
|
|
|
Portland Cement |
Kg |
1,6000 |
1.250,00 |
2.000,00 |
|
|
|
JUMLAH HARGA BAHAN |
2.000,00 |
C |
ALAT |
|
|
|
|
|
- |
- |
- |
- |
- |
|
|
|
JUMLAH HARGA ALAT |
- |
D |
Jumlah |
(A+B+C) |
|
|
11.938,50 |
E |
Overhead & Profit |
10% x D |
|
|
1.193,85 |
F |
HARGA SATUAN PEKERJAAN |
( D + E ) |
|
|
13.132,35 |