A.4.4.3.57 - Pemasangan 1 M2 dinding batu paras
A.4.4.3.57 - Pemasangan 1 M2 dinding batu paras |
NO |
URAIAN |
SATUAN |
KOEFISIEN |
HARGA SATUAN |
JUMLAH HARGA |
A |
TENAGA |
|
|
|
|
|
Pekerja |
OH |
0,7000 |
81.500,00 |
57.050,00 |
|
Tukang Batu |
OH |
0,3500 |
96.500,00 |
33.775,00 |
|
Kepala tukang |
OH |
0,0350 |
107.000,00 |
3.745,00 |
|
Mandor |
OH |
0,0350 |
107.000,00 |
3.745,00 |
|
|
|
JUMLAH HARGA TENAGA |
98.315,00 |
B |
BAHAN |
|
|
|
|
|
Batu paras |
Bh |
1,1000 |
160.000,00 |
176.000,00 |
|
Semen Portland |
Kg |
11,7500 |
1.250,00 |
14.687,50 |
|
Pasir Pasang |
M3 |
0,0350 |
350.000,00 |
12.250,00 |
|
|
|
JUMLAH HARGA BAHAN |
202.937,50 |
C |
ALAT |
|
|
|
|
|
- |
- |
- |
- |
- |
|
|
|
JUMLAH HARGA ALAT |
- |
D |
Jumlah |
(A+B+C) |
|
|
301.252,50 |
E |
Overhead & Profit |
10% x D |
|
|
30.125,25 |
F |
HARGA SATUAN PEKERJAAN |
( D + E ) |
|
|
331.377,75 |