Skip to content
A.4.5.2.2 - Pemasangan 1 M2 atap genteng kodok glazuur
A.4.5.2.2 - Pemasangan 1 M2 atap genteng kodok glazuur |
NO |
URAIAN |
SATUAN |
KOEFISIEN |
HARGA SATUAN |
JUMLAH HARGA |
A |
TENAGA |
|
|
|
|
|
Pekerja |
OH |
0,1500 |
81.500,00 |
12.225,00 |
|
Tukang Kayu |
OH |
0,0750 |
96.500,00 |
7.237,50 |
|
Kepala tukang |
OH |
0,0080 |
107.000,00 |
856,00 |
|
Mandor |
OH |
0,0080 |
107.000,00 |
856,00 |
|
|
|
JUMLAH HARGA TENAGA |
21.174,50 |
B |
BAHAN |
|
|
|
|
|
Genteng kodok |
Bh |
25,0000 |
4.800,00 |
120.000,00 |
|
|
|
JUMLAH HARGA BAHAN |
120.000,00 |
C |
ALAT |
|
|
|
|
|
- |
- |
- |
- |
- |
|
|
|
JUMLAH HARGA ALAT |
- |
D |
Jumlah |
(A+B+C) |
|
|
141.174,50 |
E |
Overhead & Profit |
10% x D |
|
|
14.117,45 |
F |
HARGA SATUAN PEKERJAAN |
( D + E ) |
|
|
155.291,95 |
======= ARTIKEL TERKAIT =======
Post a Comment for "A.4.5.2.2 - Pemasangan 1 M2 atap genteng kodok glazuur"