A.4.6.1.17 - Pemasangan 1 M2 rangka atap genteng beton, kayu kelas II
A.4.6.1.17 - Pemasangan 1 M2 rangka atap genteng beton, kayu kelas II |
NO |
URAIAN |
SATUAN |
KOEFISIEN |
HARGA SATUAN |
JUMLAH HARGA |
A |
TENAGA |
|
|
|
|
|
Pekerja |
OH |
0,1000 |
81.500,00 |
8.150,00 |
|
Tukang kayu |
OH |
0,1000 |
96.500,00 |
9.650,00 |
|
Kepala tukang |
OH |
0,0100 |
107.000,00 |
1.070,00 |
|
Mandor |
OH |
0,0050 |
107.000,00 |
535,00 |
|
|
|
JUMLAH HARGA TENAGA |
19.405,00 |
B |
BAHAN |
|
|
|
|
|
Kaso-kaso 5 x 7cm |
M3 |
0,0140 |
7.500.000,00 |
105.000,00 |
|
Reng (3 x 4) cm |
M3 |
0,0072 |
7.500.000,00 |
54.000,00 |
|
Paku 5 dan 10 cm |
Kg |
0,2500 |
23.000,00 |
5.750,00 |
|
|
|
JUMLAH HARGA BAHAN |
164.750,00 |
C |
ALAT |
|
|
|
|
|
- |
- |
- |
- |
- |
|
|
|
JUMLAH HARGA ALAT |
- |
D |
Jumlah |
(A+B+C) |
|
|
184.155,00 |
E |
Overhead & Profit |
10% x D |
|
|
18.415,50 |
F |
HARGA SATUAN PEKERJAAN |
( D + E ) |
|
|
202.570,50 |