A.4.6.2.7 - Pemasangan 1 Buah engsel angin
A.4.6.2.7 - Pemasangan 1 Buah engsel angin |
NO |
URAIAN |
SATUAN |
KOEFISIEN |
HARGA SATUAN |
JUMLAH HARGA |
A |
TENAGA |
|
|
|
|
|
Pekerja |
OH |
0,1000 |
81.500,00 |
8.150,00 |
|
Tukang kayu |
OH |
0,2000 |
96.500,00 |
19.300,00 |
|
Kepala tukang |
OH |
0,0200 |
107.000,00 |
2.140,00 |
|
Mandor |
OH |
0,0005 |
107.000,00 |
53,50 |
|
|
|
JUMLAH HARGA TENAGA |
29.643,50 |
B |
BAHAN |
|
|
|
|
|
Engsel angin |
Bh |
1,0000 |
12.000,00 |
12.000,00 |
|
|
|
JUMLAH HARGA BAHAN |
12.000,00 |
C |
ALAT |
|
|
|
|
|
- |
- |
- |
- |
- |
|
|
|
JUMLAH HARGA ALAT |
- |
D |
Jumlah |
(A+B+C) |
|
|
41.643,50 |
E |
Overhead & Profit |
10% x D |
|
|
4.164,35 |
F |
HARGA SATUAN PEKERJAAN |
( D + E ) |
|
|
45.807,85 |