Skip to content
A.4.7.1.20 - Pengecatan 1 M2 permukaan baja galvanis secara manual sistem 3 lapis
A.4.7.1.20 - Pengecatan 1 M2 permukaan baja galvanis secara manual sistem 3 lapis |
NO |
URAIAN |
SATUAN |
KOEFISIEN |
HARGA SATUAN |
JUMLAH HARGA |
A |
TENAGA |
|
|
|
|
|
Pekerja |
OH |
0,4000 |
81.500,00 |
32.600,00 |
|
Tukang cat |
OH |
0,8000 |
96.500,00 |
77.200,00 |
|
Kepala tukang |
OH |
0,0800 |
107.000,00 |
8.560,00 |
|
Mandor |
OH |
0,0200 |
107.000,00 |
2.140,00 |
|
|
|
JUMLAH HARGA TENAGA |
120.500,00 |
B |
BAHAN |
|
|
|
|
|
Cat dasar |
Kg |
0,1100 |
65.000,00 |
7.150,00 |
|
Cat antara |
Kg |
0,1700 |
65.000,00 |
11.050,00 |
|
Cat penutup |
Kg |
0,0800 |
65.000,00 |
5.200,00 |
|
Kwas |
Bh |
0,0100 |
7.500,00 |
75,00 |
|
Pengencer |
Ltr |
0,0100 |
27.500,00 |
275,00 |
|
|
|
JUMLAH HARGA BAHAN |
23.750,00 |
C |
ALAT |
|
|
|
|
|
- |
- |
- |
- |
- |
|
|
|
JUMLAH HARGA ALAT |
- |
D |
Jumlah |
(A+B+C) |
|
|
144.250,00 |
E |
Overhead & Profit |
10% x D |
|
|
14.425,00 |
F |
HARGA SATUAN PEKERJAAN |
( D + E ) |
|
|
158.675,00 |
======= ARTIKEL TERKAIT =======
Post a Comment for "A.4.7.1.20 - Pengecatan 1 M2 permukaan baja galvanis secara manual sistem 3 lapis"