Skip to content
A.5.1.1.14 - Pemasangan 1 Buah floor drain
A.5.1.1.14 - Pemasangan 1 Buah floor drain |
NO |
URAIAN |
SATUAN |
KOEFISIEN |
HARGA SATUAN |
JUMLAH HARGA |
A |
TENAGA |
|
|
|
|
|
Pekerja |
OH |
0,0100 |
81.500,00 |
815,00 |
|
Tukang batu |
OH |
0,1000 |
96.500,00 |
9.650,00 |
|
Kepala tukang |
OH |
0,0100 |
107.000,00 |
1.070,00 |
|
Mandor |
OH |
0,0050 |
107.000,00 |
535,00 |
|
|
|
JUMLAH HARGA TENAGA |
12.070,00 |
B |
BAHAN |
|
|
|
|
|
Floor drain |
Unit |
1,0000 |
20.000,00 |
20.000,00 |
|
|
|
JUMLAH HARGA BAHAN |
20.000,00 |
C |
ALAT |
|
|
|
|
|
- |
- |
- |
- |
- |
|
|
|
JUMLAH HARGA ALAT |
- |
D |
Jumlah |
(A+B+C) |
|
|
32.070,00 |
E |
Overhead & Profit |
10% x D |
|
|
3.207,00 |
F |
HARGA SATUAN PEKERJAAN |
( D + E ) |
|
|
35.277,00 |
======= ARTIKEL TERKAIT =======
Post a Comment for "A.5.1.1.14 - Pemasangan 1 Buah floor drain"